28 March 2015
Over the last two weeks we have made most of the equipment we need to store, and possibly transport, the centre section, hanging from its own wing attachment fittings
. A few parts are still missing before we can bolt the stand to the frame that we have connected to the wing attachment fittings.
All equipment that was fitted to the leading-edge strip of the centre section has now been dismantled and catalogued. We have also started the job of dismantling the equipment inside the tunnel. In here corrosion has really had a field day, and most of this equipment is sadly in poor condition. So far we have dismantled and removed the remains of a radio that was fitted at the front on the starboard side of the tunnel. We have also removed a servo unit (autopilot actuator) that was fitted at the front on the port side.




All posts in the He 115 diary · Heinkel He 115B · Flyhistorisk Museum Sola