6 May 2015
Over the past two weeks we have continued dismantling parts from the tunnel in the centre section. The main focus here is to remove the pump that was intended for dumping fuel in an emergency. To operate this pump from the cockpit there is an extensive system, made up of the characteristic German arrangement of routing a cable, threaded with balls, inside tubes. The pump itself is certainly in a deteriorated state, but it is fun to see how the control arms and the cable run are still reasonably intact and still work.

In parallel, work is going on to dismantle the struts and cranks belonging to the flaps and ailerons from the trailing edge of the centre section.
A third task that has to go on in parallel and continuously is the job of marking and documenting all parts as we go. This is of course extensive work, but nonetheless very important with a view to rebuilding the aircraft later.