22 January 2016
· Engine work, Nose and cockpit
The winter cold has really set in and made all work out in the Heinkel hall an unpleasant experience. We have therefore chosen to carry on working inside the workshop, where the temperature is a little more bearable. The restoration of the starboard elevator is well under way, and we are now working on rebuilding it. We have also finally managed to make proper documentation of all the parts that were fitted to the starboard engine mount, before removing them one by one. The throttle box with the engine controls has been brought out of storage, and we have now started cleaning and conserving it. It is an almost incredible experience to feel that all the levers, with their associated push rods and so on, can still be operated. A very thorough cleaning of the paint and conservation of moving parts and so on will be needed, but the whole thing will probably be ready by the time the exhibition season starts.