26 March 2016
It is Easter, and a little break from the weekly work on the Heinkel He 115. From the turn of the year until Easter we chose to take parts from the aircraft into the workshop, so that we could work on them in warm surroundings. But now that Easter is nearly over and spring is on its way, we will continue the work out in the Heinkel hall on conserving the wings and centre section. Most of the parts in these sections have now been removed and taken out, and the next step will be to wash the salt out of all the joints.
Sola Blikk AS have now finished sealing the Heinkel hall, so we can now install air-drying units to lower the relative humidity inside the hall.

For some time we have been unsure how we should treat, in the short and long term, the rubber dinghy that was part of the rescue equipment on board the aircraft. It lay submerged in fresh water for a long time before it was taken out of the water and stored in a dark, cool storeroom. The challenge in working out what should be done with the dinghy lies largely in identifying which rubber material it is made of, and then finding a suitable way of conserving that material. To help us with this we now have the assistance of Ståle Eliassen, who has solid specialist expertise in rubber materials. According to Ståle there are about 70,000 thermoplastic grades today, and roughly as many existed in the last century. Ståle therefore has a substantial job ahead of him to identify the right rubber material. Fortunately, the dinghy still has an intact label giving the manufacturer and serial number.




All posts in the He 115 diary · Heinkel He 115B · Flyhistorisk Museum Sola