22 April 2016
· Centre section, Outer wing panels
We are currently working on removing the last small parts from the centre section
. There are still a number of small brackets, hoses and bolts in it that we want to remove while it is still possible to unscrew them. Because many of the nuts are hard to reach, this is both difficult and time-consuming work. As far as the wings are concerned, everything that is to come out has now been removed and catalogued. When we soon also finish the removals from the centre section, we will reach a significant milestone: everything that is to be removed from the aircraft will then be out, and at the same time we will have finished the extensive job of continuously cataloguing everything that has been removed.
We have also continued work on a system that lets us store all the larger parts that have been removed hanging along the walls or from the ceiling. All this is to get the hall ready for the job that awaits, when we will wash the salt out of the countless joints in the wings and centre section.
Now that Georg has started working with us, we have gained a very welcome and well-qualified addition to the team working on the aircraft.

All posts in the He 115 diary · Heinkel He 115B · Flyhistorisk Museum Sola