13 November 2017
As a follow-up to this autumn's talks with Forsvarsmuseet (the Norwegian Armed Forces Museum), there has recently been another meeting of the Heinkel He 115 Steering Committee. The topic was once again how work on the aircraft is to continue. The big question is still how extensive the work to prevent future corrosion should be. Preserving as much of the aircraft's originality as possible while also giving the aircraft as long a life as possible will require many difficult but necessary trade-offs. It was concluded that we want to continue working on these questions in cooperation with external experts.
It was also decided that over the winter we will be given access to a more suitable room in the exhibition, so that we can create a combined display of the parts of the aircraft that are ready for exhibition.
The meeting further confirmed that work on rebuilding the nose and cockpit section can begin.
Out in the Heinkel hall we are still working on the extensive job of sorting and organising a whole host of large and small parts. These are parts that we have not yet managed to put in their proper place on the storage racks.
Below are photos of the instrument panel that was mounted at the rear in the radio operator's cockpit. The panel was fitted with a mixture of navigation and flight instruments. The aircraft had equipment in the radio operator's cockpit so that he could fly the aircraft from his position.





All posts in the He 115 diary · Heinkel He 115B · Flyhistorisk Museum Sola