1 September 2019
· Small parts, Methods and techniques
Another summer is almost over and it is once again time to think about what work must and should be done on our Heinkel He 115. The situation is now a little different from what it was when we stopped work before the holidays. Extensive and intensive work is under way to complete the museum's Bf 109 project. For a short period this work will take up a great deal of the floor space in the workshop, so there will be little space free for other work. During this period we must therefore limit our work to smaller parts that can be handled in the space we currently have available.
This limit on workshop space gives us extra time to think through which alternative methods are available to us for preserving the aircraft's originality for as long as possible. Other, larger organisations working to preserve the originality of aircraft wrecks recovered from the sea have done a lot of work on developing methods to stabilise the materials in these wrecks. One method they have developed is to give the materials an electrolytic treatment. In the time ahead, and in cooperation with the other parties involved in the He 115 project, we will carry out a new review of which of the methods developed could be relevant for our aircraft. This work will require us to make a long series of enquiries among those who have been involved in developing and using the various methods.
All posts in the He 115 diary · Heinkel He 115B · Flyhistorisk Museum Sola