8 January 2023
Over the past year, work on the Heinkel He 115 has been affected by the need to complete other projects. This was partly because of space in the workshop, and partly because we need to be able to move things around before work on the museum's new building begins.
Even so, work on the He 115 has continued the whole time. The conservation of parts has carried on in the same way as before.
We have now come so far with this work that we will shift our focus from conserving components from the Kanzel and cockpit to refitting these parts in the aircraft. Initially we will prioritise parts that were removed from the Kanzel. As we gain more space around us in the workshop, we will also join the Kanzel and cockpit sections together again.
When the aircraft was raised in 2012, the large rack that held five M.G. 15 saddle-drum magazines was completely destroyed. Fortunately we have photographs of what was left of the rack. We also have three black-and-white photographs showing parts of this magazine rack, and we have made use of a general arrangement drawing that shows, among other things, this rack. After a good deal of careful thought and fine craftsmanship, we once again have a replica of such a rack. It has been built in the workshop and also incorporates some surviving parts of the original rack. It will now be installed in the Kanzel.
The Heinkel He 115 project is approaching the point where we will need a fully restored centre section to make further progress. The centre section is a large and complex structure. Fortunately it did not suffer major damage during its time on the fjord bed. Nevertheless, there is corrosion damage that must be repaired. There are also complicated joints where steel and aluminium are riveted together. These must be opened up both for cleaning and to prevent further corrosion.
The centre section is the hub of the aircraft. All the main parts of the aircraft are attached to it. We must therefore be sure that we will not have to dismantle it at a later stage to repair corrosion. We will now consider several options for who should carry out the work on the centre section, and where. There are three main alternatives: doing all the work ourselves, doing the work ourselves with help from others, or contracting the work out to an external commercial company.
A lot of work has been done this winter mapping in detail how the centre section is built. We have also gained a detailed overview of the work that needs to be done on the section. The scope of work has been broken down into many different work packages, each with a description and photographic documentation.
Before the museum's building works begin, we must cut an opening through the concrete walls of the hall where the centre section is currently stored, so that the centre section can be moved out of the storage hall.