· Nose and cockpit, Centre section
In the first half of 2025 we have spent a lot of time preparing for the further work on the centre section. At the same time we have begun refitting parts that we previously removed from the starboard front corner of the section. Among other things, the distorted float mounting has been repaired and fitted with new bearings. We are currently working on refitting this mounting. At the same time we have carefully started work on the port front corner. The experience we have already gained from the work on the starboard corner leads us to believe that the necessary intervention here will be smaller than we first feared.

We have noticed traces of a brown substance on parts we have removed. We believe this is the remains of a sealing compound applied by the manufacturer when the aircraft was built. It will be useful in the further work on the centre section to know which substances were used back in 1939. In searching for information on the use of sealing compounds we have had a great deal of help from Christian Koenig and his friends. It is remarkable how much information about German aircraft this network manages to dig up.
To help the further work proceed without unnecessary interruptions, we have spent a lot of time obtaining consumables such as good-quality aluminium sheet, bolts and rivets. Along the way we have had good help from our good friends at the Bodø Museum, who sent us a package of rivets. This meant that we could carry on working when we had all but run out of rivets of our own.

In parallel with the work on the centre section, work has also continued on the cockpit and nose sections. Here the rebuilding of the hydraulic system has been completed. Work is now going on to rebuild the windows and the sliding hatch over the navigator's seat. To help with this work we have only photographs of varying quality to rely on. Even so, we have come a long way in reconstructing a solution. This will to a large extent be a faithful copy of what was once there. As with much else about these aircraft, close study of photographs shows that many different designs were used for these windows.




Now that the museum's Caproni project has been completed, we are getting help to make a new canopy for the Heinkel. This is a wood and Plexiglas structure, 6 metres long in total. It consists of several sections with hatches and sliding panes. When the aircraft was raised in 2012, some remains of laminated wooden hoops came up with it. These, together with some rails, are what we have to work with as we now build a copy of the large canopy.





We have written before about how, in the winter half of the year, the concrete hall out there presents a considerable challenge as a working environment. The building is dehumidified and the concrete walls hold the cold even when the temperature outside the hall is pleasant. We have now had a substantial upgrade of the electrical installation in the concrete hall and can now begin to heat the building a little when winter comes round again.