About the Heinkel He 115 project
It was a great moment on Saturday 2 June 2012 when a Heinkel He 115 B/C was lifted out of Hafrsfjorden. A large crowd of onlookers has gathered at the old German seaplane base, the weather is splendid, and the whole thing feels like a public festival. And at last the first propeller blade breaks the surface of the fjord.

The aircraft being lifted out of the fjord bears the code 8L+FH and is Werknummer 2398. It belonged to 1./Küstenfliegergruppe 906. This is a high point so far in a long process. Many volunteers and local businesses have made major contributions. And the effort is a success: a very rare aircraft, in unexpectedly good condition, is being brought up from the fjord.

The work of recovering the aircraft is an extensive project run by members of Venneforeningen Flyhistorisk Museum Sola (the Friends of Flyhistorisk Museum Sola). That the recovery can be carried out is largely thanks to extensive support from a number of companies in Nord-Jæren. They support the project with money or goods and services, free of charge or at greatly reduced prices. Without this generous support it would not be possible to carry out the project. In addition, the divers who carry out the recovery, and who contribute their extensive network, are doing a very impressive job.
After the recovery, Venneforeningen produced a presentation of what has been done. You can read it by opening the link: Recovery and further work on the He 115

The aircraft is unique in the sense that no other surviving examples of this type are known to exist anywhere in the world. The exception may be a possible wreck which, rumour has it, may be in private ownership somewhere in France. This aircraft type is also of great importance to Norwegian aviation history, since 6 He 115s were acquired for the Norwegian armed forces in 1939. It is a large aircraft, and its conservation and rebuilding is a big and extensive project. Forsvarsmuséet (the Norwegian Armed Forces Museum), which owns all German war material left behind in Norway, has entrusted responsibility for the aircraft to Flyhistorisk Museum Sola.
The Heinkel 115 project
This is a project organised under Flyhistorisk Museum Sola, and its task is to carry out the further work on the aircraft.
The project steering group
To ensure professional and coherent management of the project, the museum has set up a steering group with members from Stiftelsen Flyhistorisk Museum Sola, Jærmuseet and Venneforeningen Flyhistorisk Museum Sola. The group handles planning and all major decisions relating to the work on the Heinkel.
Double-click the pictures to see a larger version.

The way forward
Once the rebuilding of the aircraft is complete, there will probably be a need for a permanent maintenance programme to guard against further deterioration.The plan is for the museum to display a complete aircraft. That means we want to put it on floats and fit panels and other missing parts if we find this necessary. At the same time we want to preserve as much as possible of the original in terms of structure, surface finish and so on. No decision has yet been made on the extent to which it will be necessary to take all the parts apart. Every section of the aircraft will be carefully examined and individually assessed. What is to be done will be decided on the basis of a condition assessment. The project group is in contact with outside experts who will assist with this work, both in the university community in Norway and at aviation museums in Europe.Even though the aircraft is in good condition compared with other aircraft recovered from the sea, preserving it in the desired condition will be a major undertaking.
Project plan and project phases
Phase 1
Planning, recovery and storage of the aircraft in a freshwater tank. Storing the aircraft in a freshwater tank was important for several reasons. It prevented the aircraft's paint and other vulnerable details from drying out and screws from seizing, and it stopped salt from crystallising, with the fatal consequences that would have had. It was also hoped that much of the salt would be washed out. This interim storage has also given us time to prepare the second phase of the project. We can now see that the freshwater tank has served the purpose it was intended for, but also that the aircraft clearly should not stay there longer than absolutely necessary.

Phase 2
Cleaning and protective treatment of the aircraft's five main sections. All five main sections of the aircraft are taken out of the freshwater tank, thoroughly cleaned and conserved. It is important that cleaning and conservation are carried out as soon as possible, in order to limit deterioration and so give this treasure the best possible care.
Phase 3
Rebuilding / assembly. The scope of this work depends on how extensive a dismantling we have to undertake to conserve the aircraft and secure it for the future. This assessment is being made in parallel with the work in the second phase of the project. If a major dismantling and rebuild of the aircraft becomes necessary, this is beyond the museum's own capacity. Contact has therefore been established with, among others, the International Aviation and Army History Museum Fondation in Hereg, Hungary. This is a workshop that has been used with good results by both Norsk Luftfartsmuseum in Bodø and the Deutsches Technikmuseum in Berlin.
Status of the aircraft's condition
In Hafrsfjord the aircraft lay submerged in seawater with a high salt content, but probably a low oxygen content. The aircraft had one remaining engine with a gearbox housing that may have been cast in magnesium. The low oxygen content of the seawater, together with cathodic protection from the magnesium in the gearbox, may have helped to protect the aircraft. In addition, the primary structure has parts with a very good corrosion-protective surface treatment. The more secondary structural parts did not receive the same corrosion protection, and this is where the worst corrosion damage is found.
The landing and the time on the bottom caused minor mechanical damage to the primary structural parts. It is mainly parts of the tail and the left wing that have structural damage.
What has been done since the recovery
As a measure to preserve the aircraft's condition, Venneforeningen built a large concrete tank before the recovery. The aircraft has lain submerged in fresh water here, partly in order to dilute the salt concentration. In the days after the recovery the aircraft was dismantled into its five main sections.
The tail section
In autumn 2013 the 10-metre-long rear fuselage was taken out of the freshwater tank. Jærmuseet made a conservator available, who carried out a meticulous cleaning of the parts. Lanolin was used to conserve the parts. The rear fuselage is now part of the museum's exhibition.

Nose and cockpit
On 24 April 2014 the nose and cockpit section was taken out of the freshwater tank. The remaining equipment has been removed. It is mainly stored in smaller water tanks pending more thorough cleaning and conservation. The aim is to preserve as much as possible of the equipment, as well as the interior paint and markings.

We will try out new methods and techniques for this kind of work. The aim is to find ways of working that can be carried over to other parts of the aircraft. Inside the cockpit section we have used dry-ice blasting as a cleaning method with good results.

Engine
The remaining BMW 132 K engine was cleaned and dismantled immediately after the recovery. It has now been conserved, and will be rebuilt as far as we manage to obtain parts for this work.
Centre section and wings
In October 2014 the water in the concrete tank was drained for the last time. We are now preparing the centre section, wings and control surfaces, along with a good many other larger components, so that they can be stored dry. The work is being carried out in the concrete tank that was previously used to store the aircraft submerged in water. This has now been converted into a workshop and storage space for the Heinkel.
Other parts
When the aircraft was dismantled in June 2012 it was necessary to take out a large number of smaller components. These are stored in smaller freshwater tanks. Some of the parts have been given protective treatment and prepared for separate exhibitions. During the rebuild they will be returned to the aircraft.

If you would like to read ongoing, detailed information about the work on the aircraft and see pictures of it, click the tab 'Work on 8L+FH'
Methods and techniques
We want to document the methods and techniques we use in the work. Short presentations will be made of how the work on individual parts or sections has been carried out. You can find this material by choosing the category Methods and techniques on the right-hand side.
Finances
The museum will depend on new support to restore the aircraft so that it can stand as an exhibit unmatched anywhere in the world; link to the presentation brochure: Presentation of the Heinkel He 115 project.
The museum has previously completed a number of major restoration projects with its own people. Resources are, however, very limited, and most of the work is done by volunteers.
Whatever is to be done, there will be major financial and manpower challenges in achieving the desired result. A rebuild will be demanding in terms of resources, regardless of whether the work is done in-house or with outside help.

Documents
- Presentation of the Heinkel He 115 project (PDF in Norwegian, 37 MB)
- Recovery and further work on the He 115 (PDF in Norwegian, 1 MB)
- Sponsor brochure for the Heinkel He 115 project, 2015 (PDF in Norwegian, 7 MB)
All posts in the He 115 diary · Heinkel He 115B · Flyhistorisk Museum Sola